Tukang pondasi bore pile dan strauss pile manual di daerah jabodetabek untuk memperkuat pondasi bangunan bertingkat. Aug 26, 2016

Piyox was last seen:
Aug 31, 2016
    1. Piyox
      Piyox
      Tukang pondasi bore pile dan strauss pile manual di daerah jabodetabek untuk memperkuat pondasi bangunan bertingkat.
    2. Piyox
      Piyox
      Tukang pondasi bore pile mesin dan strauus pile manual
  • Loading...
  • Loading...
  • About

    Gender:
    Male
    Birthday:
    May 7, 1990 (Age: 33)
    Home Page:
    http://www.jasaborepile.com
    Location:
    Kelapa gading,Jakarta utara
    Occupation:
    Grobogan,Purwodadi
    Tukang pondasi bore pile mesin dan strauss pile manual
    Pondasi bore pile yaitu suatu metode pondasi alternatif pengganti tiang pancang hanya cara pengerjaan nya yang membedakan,namun untuk fungsi sama.Pondasi bore pile mempunyai daya dukung lebih kuat untuk menahan beban bangunan di banding jenis pondasi yang lain seperti pondasi batu kali.
    Metode pondasi bore pile :
    1.Bore pile mesin merupakan metode bore pile menggunakan mesin bore pile mini crane dapat mengerjakan bore pile dengan ukuran diameter anatara 30cm,40cm,50cm,dan maksimal 60cm dengan kedalaman maksimal sesuai hasil tes penyelidikan tanah di lokasi pekerjaan.
    2.Bore pile manual atau di sebut juga strauss pile merupakan metode pekerjaan bore pile menggunakan tenaga manual dalam pelaksanaannya,bore pile manual dapat mengerjakan bore pile dengan ukuran diameter lobang 30cm dan 40cm dengan kedalaman maksimal mencapai 10m,terbatas karenag tenaga menggunakan sistem manual.